In response to the customers’ requirements, today we will introduce what is included in the sewage pump measurement accuracy
1.Sewage pump start, diesel engine start, emergency stop, increase or decrease;
2.Electric valve control (control flow);
3.Sewage pump conditions to switch to the implementation of the test process control;
4.Automatic start-up control of the cooling device;
5.Diesel engine water temperature, oil temperature, oil pressure and gear box oil temperature automatic monitoring and alarm.
